The new “Pastoral Center” at OLGC was an 8-month project that finished under budget in September 2011. An existing building was demolished, resulting in this multi-purpose space to serve the community and local parish.

It’s open design was constructed of masonry products and includes a new commercial-grade kitchen, two restrooms and a large meeting hall with a built-in wall divider system to break up the space into two rooms if desired.